When I review a construction tender, one of the first things I look for is a blank line. If the drawings show railings but the quote gives them no price, I want to know what that means. Are the railings included somewhere else, excluded, or simply missed? Until I know, the bottom line tells me less than it appears to.

I ask the same question when two contractors price the same item differently. On shuttering, the temporary mould that holds fresh concrete, I’ve asked whether the quote assumes plywood or steel plates. I’m not saying one is always better. I want to know whether both bidders have priced what the drawings and specifications call for. Otherwise, we may be comparing two different jobs.

Quantities can change the comparison too. If one bidder has allowed for less steel, I ask the team to show me where the quantity comes from. Then I ask how the bill will be calculated if the measured quantity differs. A low rate is useful only if I know what it applies to and how any extra work will be priced and approved.

I prefer one comparison sheet based on the same drawings and scope. Put the inclusions and exclusions side by side, write down the assumptions, and get any unclear items confirmed in writing. Then look at the totals again. Sometimes the lowest quote is still the best choice. At least I know what I’m choosing.